检索范围:
排序: 展示方式:
Novel probabilistic rolling regular tetrahedron mechanism
Yonghan GUAN, Yan’an YAO, Chao LIU, Ruiming LI
《机械工程前沿(英文)》 2021年 第16卷 第2期 页码 363-378 doi: 10.1007/s11465-020-0628-9
关键词: mobile mechanism probabilistic motion rolling mechanism stochastic motion
Special Column on Multiscale Stochastic Finite Element Method
《结构与土木工程前沿(英文)》 2015年 第9卷 第2期 页码 105-106 doi: 10.1007/s11709-015-0297-7
Stochastic analysis of laminated composite plate considering stochastic homogenization problem
S. SAKATA,K. OKUDA,K. IKEDA
《结构与土木工程前沿(英文)》 2015年 第9卷 第2期 页码 141-153 doi: 10.1007/s11709-014-0286-2
关键词: stochastic homogenization multiscale stochastic analysis microscopic random variation laminated composite plate
Offline motion planning and simulation of two-robot welding coordination
Tie ZHANG, Fan OUYANG
《机械工程前沿(英文)》 2012年 第7卷 第1期 页码 81-92 doi: 10.1007/s11465-012-0309-4
This paper focuses on the two-robot welding coordination of complex curve seam which means one robot grasp the workpiece, the other hold the torch, the two robots work on the same workpiece simultaneously. This paper builds the dual-robot coordinate system at the beginning, and three point calibration method of two robots’ relative base coordinate system is presented. After that, the non master/slave scheme is chosen for the motion planning, the non master/slave scheme sets the poses versus time function of the point u on the workpiece, and calculates the two robot end effecter trajectories through the constrained relationship matrix automatically. Moreover, downhand welding is employed which can guarantee the torch and the seam keep in good contact condition all the time during the welding. Finally, a Solidworks-SimMechanics simulation platform is established, and a simulation of curved steel pipe welding is conducted. The results of the simulation illustrate the welding process can meet the requirements of downhand welding, the joint displacement curves are smooth and continuous and no joint velocities are out of working scope.
关键词: complex curve seam two robots coordinated welding motion planning
Wei GUO, Zhiwu YU
《结构与土木工程前沿(英文)》 2012年 第6卷 第4期 页码 379-384 doi: 10.1007/s11709-012-0180-8
关键词: isolated structure stochastic response non-proportional damping efficient accurate pseudo-excitation method
Hierarchical modeling of stochastic manufacturing and service systems
Zhe George ZHANG, Xiaoling YIN
《工程管理前沿(英文)》 2017年 第4卷 第3期 页码 295-303 doi: 10.15302/J-FEM-2017047
关键词: stochastic modeling QBD process PH distribution heavy traffic limits diffusion process
Discrete-event stochastic systems with correlated inputs: Modeling and performance evaluation
《工程管理前沿(英文)》 2022年 第9卷 第2期 页码 214-220 doi: 10.1007/s42524-022-0192-6
关键词: discrete-event stochastic system correlated input performance evaluation
Applying the spectral stochastic finite element method in multiple-random field RC structures
Abbas YAZDANI
《结构与土木工程前沿(英文)》 2022年 第16卷 第4期 页码 434-447 doi: 10.1007/s11709-022-0820-6
关键词: uncertainty spectral stochastic finite element method correlation length reliability assessment reinforced concrete beam/slab
Review of stochastic optimization methods for smart grid
S. Surender REDDY, Vuddanti SANDEEP, Chan-Mook JUNG
《能源前沿(英文)》 2017年 第11卷 第2期 页码 197-209 doi: 10.1007/s11708-017-0457-7
关键词: renewable energy sources stochastic optimization smart grid uncertainty optimal power flow (OPF)
An efficient stochastic dynamic analysis of soil media using radial basis function artificial neural
P. ZAKIAN
《结构与土木工程前沿(英文)》 2017年 第11卷 第4期 页码 470-479 doi: 10.1007/s11709-017-0440-8
关键词: stochastic analysis random seismic excitation finite element method artificial neural network frequency domain analysis Monte Carlo simulation
Robust train speed trajectory optimization: A stochastic constrained shortest path approach
Li WANG, Lixing YANG, Ziyou GAO, Yeran HUANG
《工程管理前沿(英文)》 2017年 第4卷 第4期 页码 408-417 doi: 10.15302/J-FEM-2017042
关键词: train speed trajectory optimization railway operation stochastic programming
Pankaj SHARMA,Ajai JAIN
《机械工程前沿(英文)》 2014年 第9卷 第4期 页码 380-389 doi: 10.1007/s11465-014-0315-9
Stochastic dynamic job shop scheduling problem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures viewpoint. A discrete event simulation model of a stochastic dynamic job shop manufacturing system is developed for investigation purpose. Nine dispatching rules identified from literature are incorporated in the simulation model. The simulation experiments are conducted under due date tightness factor of 3, shop utilization percentage of 90 % and setup times less than processing times. Results indicate that shortest setup time (SIMSET) rule provides the best performance for mean flow time and number of tardy jobs measures. The job with similar setup and modified earliest due date (JMEDD) rule provides the best performance for makespan, maximum flow time, mean tardiness, maximum tardiness, total setups and mean setup time measures.
关键词: scheduling stochastic dynamic job shop sequence-dependent setup times dispatching rule simulation
Synthesis of Intermittent-Motion Linkages with Slight Difference in Length Between Links
CHEN Xin-bo, YU Zhen
《机械工程前沿(英文)》 2006年 第1卷 第1期 页码 76-79 doi: 10.1007/s11465-005-0007-6
The design of intermittent-motion linkages using traditional methods is usually complicated. In this paper, (1) a new method for realizing intermittent motion, using linkages with a slight difference in length between links, is studied; (2) some new types of intermittent-motion linkages and their software for visual analysis and design are developed; and (3) influences of some design parameters on intermittent-motion characteristics are clarified. Results confirmed that the theory and the software are useful, making the synthesis of intermittent-motion linkages clear and easy.
关键词: synthesis useful intermittent intermittent-motion traditional
《工程管理前沿(英文)》 页码 67-81 doi: 10.1007/s42524-022-0240-2
关键词: logistics network design post-disruption response strategy two-stage stochastic programming conditional value at risk robust constraint
Design and modeling of continuum robot based on virtual-center of motion mechanism
《机械工程前沿(英文)》 2023年 第18卷 第2期 doi: 10.1007/s11465-022-0739-6
关键词: VCM mechanism continuum robot flexural joint pseudo-rigid body model cable-driven
标题 作者 时间 类型 操作
Novel probabilistic rolling regular tetrahedron mechanism
Yonghan GUAN, Yan’an YAO, Chao LIU, Ruiming LI
期刊论文
Stochastic analysis of laminated composite plate considering stochastic homogenization problem
S. SAKATA,K. OKUDA,K. IKEDA
期刊论文
Application of an efficient stochastic calculation method on the seismic analysis of an isolated structure
Wei GUO, Zhiwu YU
期刊论文
Hierarchical modeling of stochastic manufacturing and service systems
Zhe George ZHANG, Xiaoling YIN
期刊论文
Applying the spectral stochastic finite element method in multiple-random field RC structures
Abbas YAZDANI
期刊论文
Review of stochastic optimization methods for smart grid
S. Surender REDDY, Vuddanti SANDEEP, Chan-Mook JUNG
期刊论文
An efficient stochastic dynamic analysis of soil media using radial basis function artificial neural
P. ZAKIAN
期刊论文
Robust train speed trajectory optimization: A stochastic constrained shortest path approach
Li WANG, Lixing YANG, Ziyou GAO, Yeran HUANG
期刊论文
Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent
Pankaj SHARMA,Ajai JAIN
期刊论文
Synthesis of Intermittent-Motion Linkages with Slight Difference in Length Between Links
CHEN Xin-bo, YU Zhen
期刊论文
Two-stage stochastic programming with robust constraints for the logistics network post-disruption response
期刊论文